Free Template

Free Roofing Estimate Template

Everything a professional roofing estimate needs — line items, pricing guidance, payment terms, and a free tool to generate one in minutes.

Create a professional roofing estimate in minutes — free

Build itemized quotes with labor, materials, and markup. Send as PDF. No credit card required.

Standard Roofing Estimate Line Items

Include these in every roofing quote. Add, remove, or adjust based on the specific job.

Tear-off and disposal (per square or lump sum)
Roofing materials — shingles, tiles, or membrane (per square)
Underlayment and ice-and-water shield
Decking replacement (if needed, per square)
Ridge cap and hip cap materials
Flashing — chimney, valleys, pipe boots
Fascia and soffit (if in scope)
Labor — tear-off crew and installation crew (separate rates)
Equipment — scaffolding or lift hire if required
Disposal / dumpster hire
Gutters and downspouts (if in scope)
Final cleanup and debris removal

What Every Roofing Estimate Must Include

A professional roofing estimate clearly separates materials from labor, specifies the roofing system being installed (brand, product line, warranty), and includes explicit exclusions — fascia, gutters, interior damage, and permit fees are commonly assumed to be included when they're not. A well-written estimate sets client expectations, protects your margin, and reduces disputes.

Always include an expiry date. Roofing material prices (shingles, timber, metal) fluctuate with supply chain conditions. An estimate without an expiry date is an open-ended commitment on pricing you can't control.

How to Price Roofing Work

Roofing is typically priced by the square (100 sq ft of roof area). Common 2026 benchmarks for US residential roofing:

- Asphalt shingle replacement (basic 3-tab): $3.50–5.50/sq ft installed - Architectural shingles (30-year, mid-range): $4.50–7.00/sq ft installed - Metal roofing (standing seam): $10–18/sq ft installed - Tile roofing (concrete or clay): $9–18/sq ft installed

These are all-in installed prices including materials, labor, tear-off, and disposal. Adjust for your local market, pitch complexity, and access conditions.

Always add a materials buffer of 10–15% to your order quantities to account for cuts, waste, and breakage. Quote this into your materials line — it's a real cost.

Scope of Work for Roofing Estimates

The scope section is the most important part of your roofing estimate. Be specific about:

- The roofing system being installed (manufacturer, product, color) - Number of squares being replaced vs. repaired - What is and isn't included (gutters, fascia, skylights, chimneys, solar panel removal) - Underlayment specification and warranty - Sheathing/decking replacement — include a per-square rate as a potential variation, or exclude it and note it will be charged if decking is found to be damaged during tear-off - Payment terms — a deposit before material delivery, balance on completion is standard for roofing

Payment Terms for Roofing Jobs

Roofing jobs typically require a materials deposit before work begins. A standard structure:

- 30–50% deposit on contract signing (covers materials order) - Balance due within 3–7 days of job completion

For larger jobs ($10,000+), a three-stage payment is common: - 30% on signing - 30% on materials delivery / work commencement - 40% on completion

Always specify terms in writing on your estimate. 'Balance due on completion' with a clear due date is enforceable. 'Balance when you're happy with it' is not.

Build your roofing estimates in TaskArc — free

Itemized line items, PDF output, quote-to-invoice in one click. Purpose-built for roofers.

Frequently Asked Questions